BROOF (t4)
BROOF(t4) refers to the highest fire rating classification for roofs according to the European classification system BS EN 13501-5 since the national classification system BS 476-3:2004 no longer applied after 2019 and the new Approved Regulations Part B. The test indicates that the roof system prevents fire penetration for at least 60 minutes resistance to external fire spread, penetration, and burning droplets and is essential for compliance in UK building regulations, often required for flat roofs, terraces, and high-rise developments.
- No penetration of roof system within 60 minutes
- In preliminary test, after withdrawal of the test flame, specimens burn for less than 5 minutes
- In preliminary test, flame spread less than 0.38 m across region of burning
[edit] Related articles on Designing Buildings
- Blue roof.
- Cold roof.
- Designing out fire risk in roof voids.
- Existing guidance on fire compartmentation in roof voids.
- Flat roof.
- Green roof.
- Metal roofing.
- Pitched roof.
- Shingle roofing.
- Slate roofing.
- Solar panels, pitched roofs and risk of fire spread.
- Tile roofing.
- Thatch roofing.
- Types of roof.
- Warm roof.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.

















