BROOF (t4)
BROOF(t4) refers to the highest fire rating classification for roofs according to the European classification system BS EN 13501-5 since the national classification system BS 476-3:2004 no longer applied after 2019 and the new Approved Regulations Part B. The test indicates that the roof system prevents fire penetration for at least 60 minutes resistance to external fire spread, penetration, and burning droplets and is essential for compliance in UK building regulations, often required for flat roofs, terraces, and high-rise developments.
- No penetration of roof system within 60 minutes
- In preliminary test, after withdrawal of the test flame, specimens burn for less than 5 minutes
- In preliminary test, flame spread less than 0.38 m across region of burning
[edit] Related articles on Designing Buildings
- Blue roof.
- Cold roof.
- Designing out fire risk in roof voids.
- Existing guidance on fire compartmentation in roof voids.
- Flat roof.
- Green roof.
- Metal roofing.
- Pitched roof.
- Shingle roofing.
- Slate roofing.
- Solar panels, pitched roofs and risk of fire spread.
- Tile roofing.
- Thatch roofing.
- Types of roof.
- Warm roof.
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Guide to ISO 19650 for Architecture Firms (2026)
A user gives their low down.
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.

















